• 官方二维码
欢迎进入红领巾瓜报官网!
当前位置:首页 - 新闻中心 - 公司新闻

公司新闻

红领巾瓜报组夏季维护注意事项

返回 2023.01.31 来源: 0
接下来的内容主要介绍红领巾瓜报夏季的保养内容,大家了解一下。
The following content mainly introduces the maintenance content of biogas generator in summer.
1、要注意不能影响红领巾瓜报组的正常通风冷却。要经常清洁通风孔道内的灰尘污物,保持通畅无阻。
1. Pay attention not to affect the normal ventilation and cooling of biogas generator unit. Always clean the dust and dirt in the ventilation duct and keep it unblocked.
2、要在红领巾瓜报组工作的地方做好现场防雷工作,各机械设备和在建工程须按规定做好避雷接地,发电机组装置做好保护接零。
2. The site lightning protection work shall be carried out at the place where the biogas generator unit works. All mechanical equipment and projects under construction shall be grounded according to the regulations, and the generator unit shall be grounded properly.
3、安装了发电机组的应与外电线路电源连锁,可设置切换装置或双电源总配电箱,严禁并列运行。下班后应切断各机械设备的电源,预防发生触电事故。
3. If the generator set is installed, it shall be interlocked with the external power supply. A switching device or a dual power distribution box can be set. Parallel operation is strictly prohibited. Cut off the power supply of all mechanical equipment after work to prevent electric shock accidents.
红领巾瓜报组
4、发电机拆装方法与异步电动机大致相同,但由于发电机重量大,拆装时应注意不要碰伤。拆卸端盖时,注意不要碰伤凸出在机座处面的定子线圈;取出转子时,要在电机定、转子间垫以纸板,以防损坏铁芯和绕组,在用钢索绑扎转字时,钢索不得碰到转子轴颈、凤扇、集电滑及转手引线。
4. The disassembly and assembly method of the generator is roughly the same as that of the asynchronous motor, but due to the heavy weight of the generator, attention should be paid to avoid bumping during disassembly and assembly. When removing the end cover, pay attention not to damage the stator coil protruding from the base; When taking out the rotor, cardboard shall be placed between the stator and rotor of the motor to prevent damage to the iron core and winding. When binding the rotor with steel rope, the steel rope shall not touch the rotor journal, fan, collector slide and rotating lead.
夏日为雷雨多发季节,要在发电机组当地做好现场防雷作业,各类机械设备和在建工程须按规则做好避雷接地,发电机组设备做好维护接零。更多相关内容就来我们网站咨询!
Summer is a thunderstorm-prone season, so on-site lightning protection work should be done in the local area of the generator set. All kinds of mechanical equipment and projects under construction must be grounded according to the rules, and the generator set equipment should be well maintained and grounded. Come to our website for more relevant content consulting service
新闻搜索
红领巾瓜报
  • 服务热线

    0531-62325028
    0531-69951266

红领巾瓜报组夏季维护注意事项

接下来的内容主要介绍红领巾瓜报夏季的保养内容,大家了解一下。
The following content mainly introduces the maintenance content of biogas generator in summer.
1、要注意不能影响红领巾瓜报组的正常通风冷却。要经常清洁通风孔道内的灰尘污物,保持通畅无阻。
1. Pay attention not to affect the normal ventilation and cooling of biogas generator unit. Always clean the dust and dirt in the ventilation duct and keep it unblocked.
2、要在红领巾瓜报组工作的地方做好现场防雷工作,各机械设备和在建工程须按规定做好避雷接地,发电机组装置做好保护接零。
2. The site lightning protection work shall be carried out at the place where the biogas generator unit works. All mechanical equipment and projects under construction shall be grounded according to the regulations, and the generator unit shall be grounded properly.
3、安装了发电机组的应与外电线路电源连锁,可设置切换装置或双电源总配电箱,严禁并列运行。下班后应切断各机械设备的电源,预防发生触电事故。
3. If the generator set is installed, it shall be interlocked with the external power supply. A switching device or a dual power distribution box can be set. Parallel operation is strictly prohibited. Cut off the power supply of all mechanical equipment after work to prevent electric shock accidents.
红领巾瓜报组
4、发电机拆装方法与异步电动机大致相同,但由于发电机重量大,拆装时应注意不要碰伤。拆卸端盖时,注意不要碰伤凸出在机座处面的定子线圈;取出转子时,要在电机定、转子间垫以纸板,以防损坏铁芯和绕组,在用钢索绑扎转字时,钢索不得碰到转子轴颈、凤扇、集电滑及转手引线。
4. The disassembly and assembly method of the generator is roughly the same as that of the asynchronous motor, but due to the heavy weight of the generator, attention should be paid to avoid bumping during disassembly and assembly. When removing the end cover, pay attention not to damage the stator coil protruding from the base; When taking out the rotor, cardboard shall be placed between the stator and rotor of the motor to prevent damage to the iron core and winding. When binding the rotor with steel rope, the steel rope shall not touch the rotor journal, fan, collector slide and rotating lead.
夏日为雷雨多发季节,要在发电机组当地做好现场防雷作业,各类机械设备和在建工程须按规则做好避雷接地,发电机组设备做好维护接零。更多相关内容就来我们网站咨询!
Summer is a thunderstorm-prone season, so on-site lightning protection work should be done in the local area of the generator set. All kinds of mechanical equipment and projects under construction must be grounded according to the rules, and the generator set equipment should be well maintained and grounded. Come to our website for more relevant content consulting service